VigiChain
VigiChain

Entering the network

scroll
Network statusTestnet active · Mainnet locked

VigiChain

VigiChain protects digital value before the future arrives.

A sovereign post-quantum network for verified wrapped assets, self-custody, sealed receipts and financial control. Testnet active; mainnet locked until validation is complete.

Core first

The core comes first — and stays protected.

V1 is the base layer: mining, proof-of-work validation, blocks, RPC, explorer and post-quantum signatures. A BFT finality gadget is present but advisory and in development — not yet bound into fork-choice, so proof-of-work decides the canonical chain today. It depends on no external token, and the network's gas — the cost of using it — goes to the miners and validators who secure it. VIGI is the native asset — earned by mining, validating and using the network.

  • V1 — Core network
    Active on testnet. Mainnet locked until validation is complete.
  • V2 — Wrapped asset layer
    Built and tested on testnet: protocol-approved wrapped assets that mint only under a custody proof-of-reserve. Activates after independent audit.
  • V3 — Expanded verified assets
    Future: more verified fintech assets, at the same bar.
  • V4 — Global coverage
    Future: hundreds of wrapped assets — only if useful, liquid and auditable.

Security & sovereignty

Proof layers sealed into a post-quantum chain.

Value on VigiChain moves only under post-quantum signatures — the network is built as a function of the post-quantum future. And there is no public token factory: no user-accessible mint path exists, and arbitrary token creation is rejected by the consensus rules of the launched network. Only protocol-approved assets with transparent rules exist here; new asset classes could only ever be enabled by a coordinated protocol upgrade, never by an individual user.

Sealed ledger blocks in sequence

Execution layer

Instant finality, without giving up custody.

Above the base chain runs a post-quantum execution layer — a rollup where balances are native VIGI, backed one-to-one by VIGI locked on the L1. Withdrawals are trustless: a validity re-execution check finalises them instantly, or an optimistic challenge window secures them, and you can always exit to the L1 yourself even if the operator goes silent. A fraudulent batch is provably reverted. Built and tested on testnet; it stays locked with the rest of the network until independent validation closes.

Vigi Passport

Identity, credentials and licenses.

Vigi Passport anchors identities, credentials, licenses and documents to tamper-resistant proofs — and links your EVM and Bitcoin identities to one post-quantum account.

Wrapped assets with rules

Verified value, never arbitrary tokens.

The wrapped-asset layer is built and tested: protocol-approved assets — relevant stablecoins, BTC, ETH, SOL, and real DeFi, RWA, infrastructure, oracle and payments assets. Each mints only under a custody committee's on-chain proof-of-reserve, so wrapped supply can never exceed the reserve that backs it. Each carries published rules: origin, reserve proof, fee legs, risk tier and mint cap. It stays disabled until the custody bridge — the highest-risk component — passes independent audit.

Vigi Wallet

Your keys. Every chain. One vault.

The native VigiChain wallet: post-quantum self-custody across Bitcoin, Ethereum, every EVM network, Solana and Cronos — each asset shown by its original logo, with SafeSign checking every transaction before you sign.

Vigi Wallet home — one vault across Bitcoin, Ethereum, EVM networks and Solana
Vigi Wallet market — each asset with its own logo and live price

VigiBank

A sovereign bank layer, inside your wallet.

Connect external bank identities by explicit consent and read your whole capital position beside your crypto — read-only, revocable and fully self-custodial. Your funds and keys never leave your control.

VigiBank — bank capital read beside crypto, read-only and revocable

VigiRail

Institutional payments, gasless and post-quantum.

VigiRail is the institutional payment and financial-messaging layer of VigiChain — ISO 20022-compatible, post-quantum, and gasless for the sender. It is a protocol subsystem committed by VigiChain consensus, not a separate chain. Research and testnet-gated: disabled until its cryptographic, consensus and interoperability checks are independently reviewed. Mainnet stays locked.

Ecosystem

One sovereign stack, five instruments.

Each layer is honest about its state — nothing future is sold as live.

The whole surface

Everything VigiChain already includes.

One sovereign post-quantum network, and the pieces that run on it. What is active says so; what is built but still locked says that too.

  • Post-quantum chain
    Testnet active; mainnet locked until validation closes.
  • VigiScan explorer
    Blocks, transactions, validators and assets, in the open.
  • Vigi Wallet
    Self-custody across Bitcoin, Ethereum, EVM networks and Solana.
  • VigiBank
    Your bank capital read beside your crypto. Read-only and revocable.
  • Wrapped assets with rules
    Protocol-approved only. There is no public token factory.
  • VigiRail
    An institutional payment rail. Built and tested; not yet activated.
VigiScan — the VigiChain explorer: block chain view, network status, validators and real-time activity

VigiScan — explorer preview. The figures shown are sample data until the public gateway answers.

Testnet → Mainnet

Live on testnet. Locked until proven.

The network runs today as a multi-node testnet — mining and post-quantum propagation are live. A public RPC gateway and explorer come online as the public testnet infrastructure is deployed. Mainnet stays locked until independent security validation closes — no presale, no promises of return. VIGI is earned only by mining, validating and using the network.